top of page

Re-Entry Guides

Re-Entry Guides

Available in Provost, Kindersley, and Weyburn.

Use Cases:
  • Guiding tubing or tools back into packers or seal bores during re-entry operations

  • Assisting with alignment in deviated or challenging well conditions

  • Reducing risk of damage to seals or equipment during re-engagement

Sizes:
  • 60.3mm Re-entry Guide

  • 73mm Re-entry Guide   

  • 88.9mm Re-entry Guide

© 2021 by Trilogy Oilfield Rentals LTD.

  • Twitter
  • Facebook
  • Linkedin
bottom of page